1. Preparation and Recording Project Data
The proper commissioning of a heating system begins with the precise recording of all master data. In addition to the addresses of the operator and the executing HVAC company, this includes the exact equipment data of the heat generator. Enter the manufacturer, model, serial number, and nominal capacity.
Additionally, the quality of the filling water is documented in this first step. Compliance with standard regulations (such as VDI 2035 in Germany) regarding total hardness and pH value is essential to safeguard future warranty claims and prevent damage caused by scaling or corrosion in the system.
- Recording address details of operator and contractor
- Clear identification of the heat generator
- Testing and documentation of filling water parameters





