1. Record Project and PDS System Data
Every qualified inspection begins with the precise recording of property data and the assignment of system-specific documentation. Enter the exact location of the pressure differential system, the protected escape routes (e.g., safety stairwells), and the responsible contact persons.
To ensure a seamless history, manufacturer-specific documents, the fire protection concept, and the approved cause-and-effect matrix should be used as a basis. This ensures that all target values are correctly entered for subsequent measurements.
- Clear assignment of property, system, and inspection number
- Recording of system components and control configuration
- Storage of target values from the official fire safety concept





