For tiling businesses

Digital protocols for tilers

Record measurements, substrate, wet-area sealing and room-by-room acceptance with photos — instead of scraps and memory.

Bring an existing form. In the call we map your real workflow in ProtocolHero and show what the finished PDF looks like.

Fliesenleger verlegt großformatige Bodenfliesen in einem Bad
Starting point

How Tilers document today – and what it costs

In tiling the most important work is invisible after two days: substrate check, primer, waterproofing with connections and sealing tapes, slope in the screed. When water later comes through the ceiling, nobody asks whether the tile is straight but whether the waterproofing was done properly — and that can only be proven with photos from the day before tiling. Today those photos, if they exist, are on the foreman's phone.

That costs: in a water damage case after three years the company stands without evidence and pays out of goodwill or loses in court. Additional work — extra levelling, changed waterproofing height, more silicone joints — is carried out but not notified and not paid. And when the client reorders tiles after a year, nobody knows batch and shade because the box is long gone.

For the owner this means: they do not know which bathrooms were handed over with waterproofing proof, how much additional work remained unpaid and which teams document cleanly. ProtocolHero documents substrate, waterproofing and additional work before they are no longer visible.

Who ProtocolHero is built for

  • Tiling companies with several installation teams
  • Companies that fit out bathrooms in series for developers and general contractors in housing
  • Tile and natural stone companies with large projects in hotels, hospitals and commercial buildings
  • Companies with subcontractors whose substrate and waterproofing work they are responsible for
Sound like your business?Book an intro call
What it means for your business

Four things that change for management

Not more forms, but less rework, less risk and a business you can show at any time.

Proof

Waterproofing with photo and timestamp — before tiling

The template has required fields per room for substrate check, primer, waterproofing with connections and photos — and cannot be submitted before the photos are there. Everything attaches to project and room in the database, with timestamp. In a water damage case years later you show the condition before the tile.

Time

Additional work notified and signed the same day

Extra levelling, changed height, additional joints: the foreman records the work with photo, the other side's site manager signs on the tablet, the PDF goes out via link. The remark nobody invoices becomes the change order that gets paid.

Fewer errors

Batch, shade and material recorded per room

The Hero Agent reads photos of the box; tile, batch, shade and grout colour are in the protocol per room. For reorders or complaints about colour deviation the answer is a glance, not a search. Recurring blocks per room make sure no bathroom passes without details.

Control

Every bathroom in the project with status and open items

The document hub shows per project and team which rooms are finished with waterproofing proof, installation protocol and acceptance. The Hero Agent creates open items from the acceptance as cards with owner and deadline and asks for the photo of completion.

Das Problem

Schluss mit Word, Excel und Zettelwirtschaft

Diese typischen Hürden kennen Betriebe in Ihrem Gewerk – und genau hier setzt ProtocolHero an.

Measurements sit on a scrap that gets wet in the van.

Substrate and wet-area sealing are not traceable per room.

Grout, remaining work and touch-ups get lost between site and office.

Acceptance is missing as a clean PDF with photos.

Die Lösung

So unterstützt ProtocolHero Tilers

Vor Ort erfassen, im Team prüfen und freigeben, als PDF übergeben – digital, mobil und nachvollziehbar.

Measurements & substrate

Capture areas, substrate and notes per room as fields — not as a photo of a scrap.

Wet-area sealing

Record wet rooms with a photo and a short note before the surface is closed.

Acceptance per room

Add rooms as recurring blocks: grout, remaining work, photos and acceptance per room.

PDF to site management

Sign acceptance and hand it over as a PDF — including open items.

How it runs in your business

From template to proof

One continuous process instead of isolated tools – identical for every team, with clear ownership per step.

  1. 1

    Templates for concealed and visible work

    Substrate check and waterproofing, installation protocol with material, additional work notice, notice of concerns, acceptance — maintained centrally, with rooms as recurring blocks.

  2. 2

    Projects and rooms in the database

    Project, apartment, room, the other side's site management, subcontractors. Every protocol attaches to the room.

  3. 3

    Foreman documents before tiling — offline too

    Photos of substrate, waterproofing and connections on the smartphone; work continues in the shell without signal. Only when the required photos are there can it be submitted.

  4. 4

    Record material and additional work

    Photo of the box, the Hero Agent reads batch and shade. Additional work with photo and the site management's signature the same day.

  5. 5

    Approval and acceptance

    Master tiler or site manager reviews and approves; developer or client receives link and PDF. Open items run as cards with deadline on the board.

  6. 6

    Archive for the warranty period

    Bulk export per project or apartment; the history remains available with photos and timestamps for the entire warranty period.

Why it pays off

A water damage case without a photo costs more than any documentation

A tiling company with four teams easily completes 40 bathrooms a month in housing. If each bathroom costs 20 minutes for searching photos in the chat, writing up additional work afterwards and formatting the acceptance, that is roughly 13 hours a month — and the additional work forgotten along the way costs far more than the hours.

The real item is the water damage after three years: without a photo of the waterproofing before tiling the company pays for removal, rebuild and consequential damage — for one bathroom quickly a five-figure sum. With required photos per room, timestamp and approval, the question 'was the waterproofing done properly?' is answered in seconds.

  • Required photos for substrate and waterproofing — no bathroom submitted without proof
  • Additional work the same day with signature instead of unpaid in the remarks
  • Batch and shade per room — reorders and complaints without searching
  • Status per bathroom and team in the document hub
30
12

Inspection protocols, maintenance reports, acceptances, fault reports

25 min

Retyping, matching photos, follow-ups, creating the PDF, filing

5 min

Review and approve – the rest is captured on site

45

Per year, office only

€64,800

20 minutes less office work per protocol × 4,320 protocols × €45/h

4,320
protocols per year
1,440
office hours saved per year
180
working days (8 h) per year

Not included: fewer follow-ups on site, less rework, faster invoicing and the time you save when someone asks for proof. We measure the real numbers in the pilot.

Start a pilot
What other businesses achieved

Real customers, real statements

Our references come from the painting and electrical trades and document damage for insurers, construction records and acceptances directly on site — the same mechanism as proving concealed work in tiling.

Gerade bei Wasserschäden und Arbeiten für Versicherungen ist eine saubere Dokumentation extrem wichtig. Es muss nachvollziehbar festgehalten werden, welcher Schaden vorlag, welche Maßnahmen durchgeführt wurden und wie die Instandsetzung erfolgt ist. Das hilft uns intern für den Überblick, aber auch nach außen bei Rückfragen mit Kunden und Versicherungen.

Thomas Lövenich – Malermeister Thomas LövenichMalermeister Thomas Lövenich Logo
Thomas LövenichMalermeister Thomas Lövenich
Read customer story

Mit ProtocolHero läuft unsere Dokumentation heute deutlich strukturierter und einfacher. Gerade im Alltag ist es wichtig, dass Informationen nicht verloren gehen und wir alles schnell an einem Ort wiederfinden. Das spart Zeit und bringt mehr Klarheit ins Team. Was ich außerdem gut finde: ProtocolHero ist vielseitig einsetzbar – ob Schlüsselübergabe, Baudokumentation oder wichtige Prüfprotokolle.

Tim Schnüge – Schnüge ElektrotechnikSchnüge Elektrotechnik Logo
Tim SchnügeSchnüge Elektrotechnik
Read customer story

Ich nutze ProtocolHero in meinem Elektrofachbetrieb für die Erstellung von Prüf- und Abnahmeprotokollen und bin sehr zufrieden. Besonders praktisch finde ich, dass ich Protokolle direkt digital erstellen und problemlos auf der Baustelle ausfüllen kann. Die Software ist übersichtlich und einfach zu bedienen – deutlich weniger Papierkram und eine viel effizientere Dokumentation.

Kushtrim Behrami – Behrami & Nura GbRBehrami & Nura GbR Logo
Kushtrim BehramiBehrami & Nura GbR
Read customer story
All customer stories
Häufige Fragen

Fragen rund um Tilers

See your Tilers workflow in ProtocolHero

In 15 minutes we clarify where time is lost today, whether ProtocolHero fits your process and team size, and how a real report of your business looks digitally. No generic product pitch.